Material readiness for turnarounds and shutdowns

Know what's missing before day one.

Fullkit reads your turnaround's ERP exports and shows, line by line, which parts won't be on site by the material-ready date, which long-lead items are already past saving, and who has to act today.

See the Readiness DiagnosticOne turnaround. One week. Fixed fee.
TAR-A · Crude & VacuumT−22
69% of lines secured, against a glide path of 84%
E-104A42%RED
C-10155%RED
P-102A80%RED
F-10190%AMBER
E-41037%RED
E-410 looks ahead of plan, but its tube bundle was never requested and its lead time already runs past the material-ready date.
Glide path: where you should be by todayDemo data from a fictional refinery
Why it matters

Turnarounds rarely run to plan, and missing material is one of the quietest reasons.

Scope keeps growing after freeze. Findings come in after the plant opens. A part that is "on order" turns out to be short by half, or promised a week after the crew needs it. The spreadsheet says green until the day it doesn't.

Fullkit checks quantity, not paperwork. A demand line or a PO isn't coverage until the numbers add up to what the job needs, in time.

2 in 3

turnarounds exceed planned cost and schedule by 10% or more, or trip after start-up

40%

overrun cost or schedule by more than 30%

19%

average scope growth between scope freeze and execution

Figures from AP-Networks' database of more than 1,350 turnarounds, as cited by Reliability Academy.

What Fullkit shows

One board, three questions answered.

Fulfilment

Will every part be here in time?

Each required line is filled from stock, then received orders, then open orders. Whatever is left is a gap, and an order promised after the material-ready date counts as late.

Risk

What can no longer make it?

Lines whose lead time already runs past the need date are flagged now, while there's still time to expedite, re-source or move the date. One long-lead breach turns a work package red on its own.

Action

Who has to move today?

Every open line is routed to the person who can fix it: buyer, planner, scope owner, engineering or materials control, sorted by need-by date.

How it works

From exports to answers in a week.

Day 1

Send the exports

Requirements, demands, stock allocations, shortages, purchase orders and milestone dates, straight from your ERP. SAP, Oracle, IFS, Maximo or plain Excel all work.

Days 2 to 4

We reconcile

Fullkit maps your columns once, runs every line, and checks the results with your materials team so nothing is lost in translation.

Day 5

You get the readout

The board, the action queue by owner and the full Excel results, walked through in a 30-minute session with your turnaround lead.

Your data stays with you. Fullkit runs in the browser on your own machine. Nothing is uploaded to a server, and there's nothing to install or integrate. If your security team prefers, you run it yourself and share only the results.

The Readiness Diagnostic

A full readiness check on your next turnaround.

  • Every line that won't be in hand by the material-ready date
  • Long-lead items already past their lead time
  • An action list by owner, sorted by need-by date
  • Process breaches: late demands, late dispositions, scope added after freeze
  • The full results in Excel, yours to keep
Scope
One turnaround or shutdown
Turnaround time
One week from receiving exports
Fee
Fixed, agreed before we start
Best timing
3 to 9 months before execution
Ask about your turnaround
Who it's for

Built for the people who own the start date.

Turnaround managers, materials coordinators, planners and project controls teams at refineries, petrochemical and chemical plants, fertilizer, LNG, mining and power stations.

Turnaround contractors and consultancies use it inside their own client engagements. If that's you, we'd like to talk about partnering.

RefiningPetrochemicalsChemicalsFertilizerLNGMiningPowerContractors